A UPS procedure with on-line double-conversion topology (and generator manner) will continually filter soiled power and produce clean AC output power. Filthy power is noisy, which makes a jagged sine wave but stops optimum power output. Generator Load Bank Testing a generator includes applying a man-made load to confirm that https://bookmarkquotes.com/story18158420/the-definitive-guide-to-generator-and-power-supply